Module Offloading Facility & Product Loading Jetty

CLIENT

BAM Clough JV

services

Civil Construction

YEAR

2013

budget

$13M
  • Construct a load sharing runway over unstable ground to accommodate the operation of a 750-tonne crawler crane; 

  • Maintain pavement structures for the logistics operations within the yard;

  • Reinstate a collapsed 10-metre-high concrete wharf marine wall to a standard to accommodate a 600-tonne crane alongside;Including a 5,000 m3 concrete retainment structure and wharf crane deck.
  • Filling by rock included utilization of mechanical/ hydraulic mobile truck mounted conveyors;
  • Total quantity of 5-75 mm Filler Rock carted 100km from quarry source was approx. 485,000 tonnes utilizing double shift over a 9-month period;
  • Laying of approx. 500 m of 600 mm drainage pipe, at an RL below the average low tide level;
  • Extension of the 50-metre-wide MOF Causeway to connect to the MOF itself, with associated pavements and placement of armour rock on batters including the use of long-reach excavators;
  • Provision of all support logistics to ensure the TMP was functional and safe;
  • Supporting mechanical services and marine services;
  • MOF Causeway Pavement Works, including sealing.